|
The eProcurement System of Haryana enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
|
|
| |
1. Supply of earth, fly ash, GSB, WMM, 50mm BM, 30mm BC and construction of RCC culvert all other works contingent thereto including defect liability period 3 years free of cost |
HSVP/DIV-II/2022-23/54 |
06-Jun-2022 06:00 PM |
07-Jun-2022 11:00 AM |
2. Widening and Strengthening of road from Sailba to Golni (ID 410) Km. 0.00 to 1.50 Jaurion Harnaul to Golanpur (ID 436) Km 0.00 to 0.63, Harnaul to Ismailpur (ID 611) Km 0.00 to 1.10, Radaur Mustafabad road to Silli Kalan (ID 622) Km 0.00 to 0.57 and |
PWD/CHD/YNGAR/1334 |
03-Jun-2022 05:00 PM |
06-Jun-2022 11:00 AM |
3. MANDOTHI Estimate for laying of balance Connecting pipe of 100mm and 150mm i.d and Repair of existing Structures of both Water Works i.e. Old and 2nd Water Works Mandothi under the Jal Jeevan Mission Programme in village MANDOTHI |
38319 Dt. 02.05.2022 JJM Mandothi |
08-Jun-2022 01:00 PM |
08-Jun-2022 01:05 PM |
4. Cleaning of Strom Water drainage lines with jetting and hydraulic suction machine in Old Indl. Area Panipat. |
HSIIDC/Panipat/May/2 |
30-May-2022 03:00 PM |
31-May-2022 12:30 PM |
5. Collection of toll on TP-39 (Hodal-Nuh-Pataudi-Patauda road at km. 7.50, 53.00 and 67.75) |
PWD/Nuh/Toll/TP39 |
09-Jun-2022 05:00 PM |
10-Jun-2022 09:00 AM |
6. Widening and Strengthening of Saharanpur- Kurushetra Road to Dhaulra (ID 570) (0.00 to 1.75) in Yamuna Nagar Districts |
PWD/CHD/YNGAR/1335 |
03-Jun-2022 05:00 PM |
06-Jun-2022 11:00 AM |
7. Consultancy service for preparation of DPR with the scope of carrying out survey, Geo-Technical investigation, Working Designs, Detailed Designing, Detailed Estimate with BOQ Modifications alongwith cost benefit analysis including EIRR, FIRR, ESMS et |
272/DPR/HSRDC/Rohtak |
10-Jun-2022 05:00 PM |
13-Jun-2022 09:00 AM |
8. Construction of pedestrian path and thermoplastic paint on 30 mtr wide road and overhead gantry board near NIFT Sector 23 Part-II, Panchkula Extension |
HSVP/DIV-II/2022-23/51 |
06-Jun-2022 06:00 PM |
07-Jun-2022 11:00 AM |
9. Construction rising of Sewer Manhole at various points complete in all respect in Sector 3 Panchkula |
HSVP/DIV-I/2022-2023/104 |
27-May-2022 03:00 PM |
30-May-2022 03:00 PM |
10. PF of Sluice Valve CID Joints Rubber sheet Pig led and Hiring of JCB for excavation and |
HSVP/DIV-I/2022-2023/103 |
27-May-2022 03:00 PM |
30-May-2022 03:00 PM |
|
|
|
|
 |
|
|
|
|
|
|
Search with ID/Title/Reference no |
|
|
|